| Project | 
                     Contract Value   
                      in 
                      Crore (Rs.)   
                       |                   
                
                      
                   
                   | Stage 3 Pumping station (5X30 MW) of Kalwakurthy Lift 
                        irrigation Scheme. | 
                    631.99 | 
                  
                  
                    | Brahmaputra Bridge near Guwahati on NH-31 in Assam | 
                    238.34 | 
                  
                  
                   
                  
                  
                    | Design and Construction of complete new 107 MLD capacity potable 
                        Water Supply Infrastructure Project on Turnkey basis for Guwahati City | 
                    349.7 | 
                  
                  
                    | Construction of Bridge and its approaches over river Yamuna D/s of 
                        existing bridge at Wazirabad, Delhi | 
                    631.81 | 
                  
 
                  
                   
                    | Turnkey EPC Contract for Civil, Structural, Architectural & allied 
                        Works for 2X520 (1040) MW Thermal Power project at Vishakhapatnam (A. P.) | 
                    267 | 
                  
                  
                    | Punatsangchhu - II Hydroelectric Project (990 MW) – Contract 
                        Package # C-2: “Construction of Headrace Tunnel (HRT) from Adit – I & Adit – II” | 
                    398.32 | 
                  
                   
                    | Improvement/Upgradation of Birpur-Balua-Jadia 
                        Meergunj-Murligunj-Udaikishangunj Road (SH-91) Length – 101.7 Km. Contract 
                        Package No. - 4 of BSHP-II. | 
                    328.89 | 
                  
              
                  
                    | Execution of Electro Mechanical Works for Development of 66 MW 
                        Rangit-II, Hydro Electric Project at West Sikkim | 
                    104 | 
                  
                  
                    | Construction of Head Race Tunnel including Construction Adits (I, 
                        II, III, IV&V) and Associated Works of HRT of Mangdechhu Hydroelectric Project 
                        Bhutan | 
                    343.11 | 
                  
                  
                    | Package JMS-2: Construction of Behala Bazar, Taratala and Majerhat 
                        Stations including all related works (Architecture, Electrical & mechanical, 
                        HVAC, Fire Detection and Fire Suppression System and Public Health Engineering) 
                        in Joka-BBD bag Corridor of Kolkatta Metro Railway line | 
                    162.67 | 
                  
                  
                    | Design, Engineering, Procurement of Materials & Equipment, 
                        Construction and All other works and things necessary for completion of the 
                        Project of Four Laning of National highway No. 75-E including the Section from 
                        KM.83/4 to KM 195/8 (apprx. 102.60 KM) on Sidhi Singrauli Section in the State 
                        of Madhya Pradesh | 
                    900 | 
                  
                  
                    | Construction of Coffer Dams, Diversion Tunnel, Concrete Dam 
                        including Spillway, Power Intake, Part HRT (upto RD 6347m) and Construction 
                        Adits: under Main Civil Works Package – Lot 1 for 180 MW Bajoli Holi HEP, 
                        Himachal Pradesh, India | 
                    369 | 
                  
                  
                    | Narmada Gudhamalani Water Supply Project | 
                    121.48 | 
                  
                  
                    | Approach Road & Bridges at Baluaha Ghat, Bihar | 
                    231.15 | 
                  
                 
                  
                    | Main Civil Works Package For 180 MW Bajoli Holi HEP, Himachal 
                        Pradesh, India | 
                    400 | 
                  
                  
                    | Tonk Water Supply Project. | 
                    245.39 | 
                  
                  
                    | Construction of Balance Civil Works of HRT by TBM (Lot PB 2A) of 
                        Parbati HE Project-Stage-II | 
                    447.74 | 
                  
                  
                  
                    | Pokaran Water Supply Project | 
                    392.66 | 
                  
                  
                    | Construction of Elevated Road Corridor from AIIMS (on NH-98) to 
                        Digha (On Ganga Path) (11.90 Km) at Patna in the State of Bihar on Engineer 
                        Procurement and Construction (EPC) mode (the “Project”) | 
                    717.4 | 
                  
                  
                    | Jawai Water Supply Project | 
                    315.5 | 
                  
                  
                    | Execution of balance civil works related to concrete dam, diversion 
                        works, intake and 1.35 Km HRT of Vyasi H.E. Project (120 MW) in District 
                        Dehradun | 
                    317.05 | 
                  
                  
                    | Natural Draught Cooling Towers and Cooling Water Pump house Package 
                        for RAPP-7&8 including allied works | 
                    648.39 | 
                  
                 
                  
                    | Package ANS-2: Construction of Seven (07) Stations Including 
                        Related Works from Barun Sengupta to Bidhan Nagar in New Garia-Airport Metro 
                        Corridor of Kolkata metro Railway Line | 
                    338.96 | 
                  
                  
                    | Western Dedicated Freight Corridor -Special Steel Bridge Contract 
                        Package – 3A (R) (ICB No. CT P-3A | 
                    157.95 | 
                  
                  
                    | 4 laning of NH-37A from KM 0.00 (Kaliabor Tiniali Road Junction) to 
                        KM 17.300 (Dolabari Road Junction) including Construction of New Brahmaputra 
                        Bridge on EPC Basis in the State of Assam under Phase A of SARDP-NE | 
                    588.95 | 
                  
                  
                    |  Channelization of Gomti River (FROM HARDING BRIDGE TO WEIR) | 
                    516.73 | 
                  
                   
                    |  Construction, Operation and Maintenance of balance works for 4 laning of NH-17B from 
                    Varunpuri to Sada Junction and Elevated road cum Flyover cum ROB from Ravindra Bhavan junction to Gate No.09 
                    of the MPT including its loop connectivity ramps in the State Of Goa.) | 
                    397 | 
                  
                   
                    |  Four Laning of Udhampur to Ramban Section of NH-1A in the State of Jammu & Kashmir Under NHDP Phase-II | 
                    1709.99 | 
                  
		
                    |  Four laning of Hospet-Bellary-Karnataka/AP Border from Km 280.080 (Design Ch.) to Km. 375.450 (Design Ch.), design length 95.370, NH-63 in the State of Karnataka under NHDP Phase – IVB on EPC mode. | 
                    870 | 
                  
                   
                    |  Construction of South side Approach road of Digha Rail-Cum-Road bridge from AIIMS (on NH98) to Digha including elevated structure over Ashok Rajpath and remaining Elevated Structure upto Digha Rail-Cum-Road {NHAI Leftover Portion} (Ch.0.00 to Ch. 2.6000, Ch.  3.400 to Ch.11.344 and Ch. 12.270 to Ch. 12.420) at Patna in the State of Bihar on EPC Mode.  | 
                    157.14 | 
                  
 
                    |  Construction of Partially Access Controlled Four lane Elevated Highway between Samrala Chowk to Ludhiana Municipal Limit of NH-95, Punjab. | 
                    756.27 | 
                  
                   
                    |  Rehabilitation & Upgradation of Two laning of Maheshkhunt-Saharsa-Purnea section of NH 107 from km. 90.000 to km. 177.960 in the State of Bihar on EPC Mode-Package-II.  | 
                    736.01 | 
                  
 
                 
                    |  Civil works of SMS-II project (BOF & CCP) for 5-10 MTPA
Expansion Project at JSW Steel Ltd., Dolvi | 
                    208.02 | 
                  
                   
                    |  Balance works of Regional water supply schemes of 199 villages and their habitations of P.S Jawaja , Tehsil Beawar District Ajmer, on Fluoride Control Project on Single responsibility turnkey basis i.e., Design Build and 1 Yr. Defect Liability and 9 Yr. Operation & Maintenance.  | 
                    174.45 | 
                  
 
                    
                    |  Construction of balance works of tunnel T-48 (between Km 100.000 to 110.200 approx) on Katra-Banihal Section of Udhampur- Srinagar-Baramulla New BG Railway line project (Package Tunnel T-48R) | 
                    1170.32 | 
                  
                   
                    |  Construction of 4-Lane NH-29 Bypass, Phase-II connecting NH-29 with NH-2 as part of Varanasi Ring Road, Design Chainage km 30.600 to km 57.320 in the State of Uttar Pradesh under
NHDP Phase-VII, on EPC mode | 
                    949 | 
                  
 
 
                    
                    |   Construction of proposed 6 Lane Elevated Connector between Belghoria Expressway and Kalyani Expressway including widening of Kalyani Expressway to 6 Lane from Nimta to Muragacha (Total Length 4.565 Km) (Phase - I) on EPC Mode in the District of North 24 Parganas in West Bengal. | 
                    494.99 | 
                  
                   
                    |  Mizoram Road Project-(NH-54)-(Pkg-II), Mizoram | 
                    512.00 | 
                  
                  
                    |  Sivok Tunnels T1 & T2 | 
                    595.86 | 
                  
 
                  
                    |  Kosi Bridge Project-(NH-527), Bihar | 
                    1101.99 | 
                  
  
                  
                    |  NDCT @ 2x660 MW Udangudi STPP.2 | 
                    165.95 | 
                  
 
                  
                    |  Construction of balance civil works package : Lot-II for underground power house and transformer cavern, Part of HRT - I  & HRT - II, Surge Shafts, Presuure Shafts, and ADITs. TRT and other Associated Structures etc. of Teest - VI HE Project, Sikkim | 
                    1248.4 | 
                  
  
                  
                    |  Execution of 1500m Head Race Tunnel Works of Parbati-II HE Project, (LOT PB-2C) | 
                    211.64 | 
                  
 
 
                   
                    |  Construction of Civil , Architectural, Mechanical, Electrical, C&I and Other Allied Works of Natural Draught Cooling Towers (2 NDCTs) including Supply of Materials, Labour, Tools & Plants, etc. required at Package 2  for 5 x 800 MW Yadadri  STPP, Telangana | 
                    189.8 | 
                  
  
                  
                    |  Rengali Irrigation Project | 
                    230.94 | 
                  
 
                   
                    |  Kohima New BG Line T-17, 18, 19 | 
                    139.31 | 
                  
  
                    
                   | Rehabilitation & Upgradation Of Existing Road Between Km 29.725 To Km 60.550 (Suraithota - Malari) NHSL To Double Lane Specification On Joshimath – Malari (NH-    107B) Road On EPC Mode In The State Of Uttarakhand (Length 30.825 Km). BRO Shivalik, Suraithota-Malari | 
                    131.25 | 
                  
                   
                    | Rafiabad-Chamkot (RKCTC NH-701 PKG-1) | 
                    473.25 | 
                  
                  
                   | Chetak Circle Flyover at Udaipur (GECPL – TLL JV) | 
                    136.89 |